Aktiesnakken — Maj 2022
-
Ingen ændringer i shorts i dag ser det ud til. Er det mon bare shorterne der bytter med hinanden i går og i dag. Det vil da forklare den aggressive pressen nedad.
-
Så kan vi nok ramme kurs 11 i dag på de sidste 40 min.
-
så snart der en der rydder et par lag op er det ikke andet end gap på gap langt op, så det en algo der hele tiden presser ned og lægger 3-5 lag og så snart der bliver bidt af dem, springer de væk
-
@DT - Tænker at denne stilling vil kun er relevant når man skal købe udstyr ind til nye frabrikker :-).https://65458.webcruiter.no/Main/Recruit/Public/4521304721?l"We are strengthening our technical department and are searching for Package Responsible Engineer managing procurement packages for pyrolysis reactors, catalysis, distillation towers, thermal lube oil systems, ash handling, ventilation, control systems, instrumentation, general electrical installations, general process equipment etc. "
-
Ja, der ikke noget firmaets ageren der tyder på at vi lukker i morgen, modsat udsalget det sidste stykke tid.
-
så med mindre at der sluppet info ud om en emission melding i morgen, går jeg ud fra det her er anlyktikerne og shorternes værk, i en perfekt storm (markedes klimaet).
-
<u><b>Sidste top 20 (per 09.05) er lagt ud:</b></u><br>
► Maj 2022: http://cqz.eu/QFUEL__2022-05_topp-20.png <br>
► Year to date 2022: http://cqz.eu/QFUEL__2022-YTD_topp-20.png <br>
► Måneder 2022: http://cqz.eu/QFUEL__2022-MONTHS_topp-20.png <br>
► Hele 2022: http://cqz.eu/QFUEL__2022_topp-20.png -
Tak @Reserven !
-
Så er det regnskabets time, lige om lidt

-
-
- we achieved 30 days of continuous operation on both lines.
-
- Progressing with full speed on named projects internationally
- Positive operational cashflow from the plants expected within second half of 2022
- Skive 2022 production volume target adjusted to be in the range of 6,000 - 8,000 tonnes
-
av av til den sidste

-
- Progressing with full speed on named projects internationally <br>
- Positive operational cashflow from the plants expected within second half of 2022 <br>
- Skive 2022 production volume target adjusted to be in the range of 6,000 - 8,000 tonnes
-
Targeting positive operational cash flow from the plants within
second half of 2022 -
Det må vel være den mekaniske recycling der giver så meget mere når Skive kun når 6-8k i 2022
-
Macroeconomic trends are in favour of Quantafuel’s growth plans. Quantafuel continues to
experience high interest from major international companies within petrochemical, refineries, and
fast-moving consumer goods, and even more so after reaching PoC. Also, on the sorting and
mechanical recycling side, we are seeing high demand, supported by increasing market prices for
receiving plastic waste, as well as highly attractive sales prices for sorted hard plastic PE and PP
products -
We have gained invaluable
learnings from the Skive plant and are in the process of finalising the concept design for the next
generation Quantafuel PtL plants, leading up to a first Final Investment Decision (FID) later this year. -
Stepping up in load without negatively impacting stability requires thoroughness and continuous
optimisation. This work will continue through the next quarters with onboarding of the third and
fourth production line in Q2 2022 and Q3 2022 respectively, with the target to exit the year at a run
rate equal to nameplate capacity. Testing has not revealed any need for significant plant upgrades to
reach this target
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Tilmeld Log ind