<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[QuesterreEnergy - Melding vedr. Montney]]></title><description><![CDATA[<p dir="auto">Melding og kommentarer fra Pareto. Vi kan forvente meldinger omkring hele 5 brønde den kommende tid.</p>
<p dir="auto">QEC: Questerre updates Montney activities</p>
<p dir="auto">06:15</p>
<p dir="auto">Calgary, Alberta -- Questerre Energy Corporation<br />
(Questerre or the Company) (TSX,OSE:QEC) updated<br />
its operated and joint venture activities in the<br />
Kakwa-Resthaven area of Alberta.</p>
<p dir="auto">Michael Binnion, President and Chief Executive<br />
Officer, commented, Over the next several weeks, we<br />
expect to see the results from five important Montney<br />
wells. The completion of the 16-07 Well in Kakwa South<br />
is underway and this should prove up the condensate<br />
rates on our ten-section block. In Kakwa North, we are<br />
currently drilling the horizontal leg of the 14-29<br />
Well and this should be finished by early August. This<br />
100% well directly offsets our JV acreage and, once<br />
completed, we believe it will confirm the potential of<br />
this seven section block.</p>
<p dir="auto">Commenting on the joint venture acreage, he added, We<br />
have also started the completion of three Montney<br />
wells with horizontal legs of one and half miles.<br />
These wells could materially improve the economics of<br />
this play with increased recovery at a lower relative<br />
cost. We expect that the majority of our future wells<br />
will have similar lateral lengths.</p>
<p dir="auto">The Company reported that completion operations have<br />
commenced this week on the 16-07-62-5W6M (the 16-07<br />
Well). The planned completion for the 16-07 Well will<br />
include a ten stage slick water fracture stimulation<br />
in the approximate 1000m horizontal leg. Questerre<br />
holds a 100% working interest in this well and ten<br />
sections of land situated approximately six miles<br />
south of its producing acreage.</p>
<p dir="auto">Questerre also reported that drilling of the<br />
horizontal leg is underway on the 14-29-63-6W6M well<br />
(the 14-29 Well). Approximately 400m remain of a<br />
planned 2000m horizontal leg targeting a total<br />
measured depth of 5900m. The Company holds a 100%<br />
interest in the 14-29 Well and seven sections of<br />
acreage adjacent to its producing joint venture<br />
acreage.</p>
<p dir="auto">The Company also updated activities on its joint<br />
venture acreage. The operator has begun the completion<br />
of three wells drilled from one pad. Each of these has<br />
a lateral leg of approximately one and a half miles.<br />
These include the 09-20-63-5W6M well (the 09-20<br />
Well), the 02-18-63-5W6M well (the 02-18 Well) and<br />
the 08-20-63-5W6M (the 08-20 Well). The surface<br />
location is situation on the existing gathering system<br />
and the wells will be equipped and tied-in once<br />
completion and testing is finished. Drilling<br />
operations are also underway on two additional wells,<br />
the 04-19-63-5W6M well (04-19 Well), less than one<br />
mile away from the multi-well pad and the 01-14-63-<br />
6W6M well (the 01-14 Well), about two miles away<br />
from the pad.</p>
<p dir="auto">Questerre is leveraging its expertise gained through<br />
early exposure to shale and other non-conventional<br />
reservoirs. The Company has base production and<br />
reserves in the tight oil Bakken/Torquay of southeast<br />
Saskatchewan. It is bringing on production from its<br />
lands in the heart of the high-liquids Montney shale<br />
fairway. It is a leader on social license to operate<br />
issues for its Utica shale gas discovery in the St.<br />
Lawrence Lowlands, Quebec. In conjunction with a<br />
supermajor, it is at the leading edge of<br />
commercializing a proven process to unlock the massive<br />
resource potential of oil shale.</p>
<p dir="auto">Questerre is a believer that the future success of the<br />
oil and gas industry depends on a balance of<br />
economics, environment and society. We are committed<br />
to being transparent and are respectful that the<br />
public must be part of making the important choices<br />
for our energy future.<br />
For further information, please contact:</p>
<p dir="auto">Questerre Energy Corporation<br />
Anela Dido, Investor Relations<br />
(403) 777-1185 ' (403) 777-1578 (FAX) 'Email:<br />
<a href="mailto:info@questerre.com" rel="nofollow ugc">info@questerre.com</a></p>
<p dir="auto">Paretos Kommentarer:</p>
<p dir="auto">Fra Pareto;</p>
<p dir="auto">"Questerre Energy has announced an update on its progress in the Montney area, where the company expect results from 5 wells over the next weeks</p>
<p dir="auto">The completion operations commenced this week on the 16-07 well (100% WI) drilled in the 10 sections block located approximately 6 miles south of its non-operated producing acreage</p>
<p dir="auto">Questerre also reports that drilling of the planned 2000 metres horizontal leg of the 14-29 well (100% WI) is expected to be completed in early August. This well is located at the company's 7 section block adjacent to its non-operated producing acreage</p>
<p dir="auto">The results from these wells could in our opinion significantly derisk the Value of Questerre's operated acreage in the Montney</p>
<p dir="auto">Our risked valuation of Questerre's operated 7 and 10 sections blocks is NOK 4.9/share, with significant upside to our unrisked valuation of NOK 10/share</p>
<p dir="auto">In its non-operated acreage, the completion of 3 wells (25% WI) is ongoing while drilling of two additional wells has started. The partners now target longer horizontal legs of about 1.5 miles, which Questerre reports could materially improve well economics by increased recovery at a lower relative cost</p>
<p dir="auto">Although expected, we view it as positive that the company is significantly increasing its drilling activities to reach the 6,000 boe/day production target by mid-2015</p>
<p dir="auto">We have a NOK 12 TP on QEC based on a risked valuation of Montney at NOK 10/share and risked Value of other assets at NOK 2/share"</p>
]]></description><link>https://dev.proinvestor.com/forum/topic/437947/questerreenergy-melding-vedr-montney</link><generator>RSS for Node</generator><lastBuildDate>Sat, 25 Jul 2026 02:51:03 GMT</lastBuildDate><atom:link href="https://dev.proinvestor.com/forum/topic/437947.rss" rel="self" type="application/rss+xml"/><pubDate>Mon, 28 Jul 2014 08:57:43 GMT</pubDate><ttl>60</ttl></channel></rss>